Since this year, Shandong Giant pipe industry adhere to the benefit as the center, a comprehensive standard of steel pipe production, read good “four words”, to increase efficiency, improve quality, reduce costs, attack output, to ensure the realization of the first quarter of production “good start”.
“Strict” the word first, comprehensive pressure.
The factory takes civilized production as the starting point, increase the on-site inspection, labor discipline, process operation discipline, management performance, instructions, rectification and other work, improve the performance of management personnel at all levels, create a strict, strict, rigorous and serious working atmosphere.At the same time, the daily scheduling meeting will report and analyze the problems of the work of the day, clear rectification measures, to ensure the implementation of the work.
“Real” word as the basis, all cost reduction.
The plant to reduce production costs as the main line, accelerate the promotion of steel material consumption, alloy, bulk material, resistant materials, continuous pouring furnace number and other indicators, the establishment of “daily cleaning daily settlement” accounting model promotion scheme.And organize and carry out the 2022 “standard innovation, tap potential, improve quality, reduce cost and increase efficiency” team cost analysis skills competition, to stimulate the enthusiasm of all staff to reduce costs.
“Quality” word to protect, comprehensive quality.
The plant shall increase production process control, reduce quality loss by composition modification, water quality and crack reduction, promote the operation of PQA quality determination system and improve the quality of casting.At the same time, vigorously promote the “consistent system” system, promote the whole process of oxygen content control and the whole process of temperature system research work, formulate the status monitoring and emergency plan of continuous casting machine, standardize the daily monitoring method and suspension system of casting machine status, to ensure the stability of the quality of various steel.
“Fight” word take the first, to attack production.
The plant takes efficient production as the leading role, and establishes an efficient production mode centered on continuous casting.By further promoting the matching of furnace machine under the condition of high continuous casting and constant pulling speed, and the inspection and adjustment of various performance indicators before the production of continuous casting machine are strengthened, the target pulling speed of existing steel types is optimized, and the pulling speed of all steel types is generally increased by 0.2 m / minute.On February 15, the daily output of no. 7 continuous casting machine of the plant exceeded 6000 tons for the first time, creating a new record of 13 shift furnaces and 17 single pouring furnaces for the first time, laying a solid foundation for production improvement and efficient production.
Shandong Jute Steel Pipe Co.,Ltd.
Contacts: Mr. Ji
WhatsApp: +86 18865211873
WeChat: +86 18865211873
E-mail: jutesteelpipe@gmail.com
E-mail: juteguanye@aliyun.com
Post time: Mar-11-2022